Completed
|
MAJOR PROJECTS EXECUTED |
|||||||||
|
Sl # |
Project |
Client |
Location |
||||||
|
1 |
Automated Tank Cleaning & Sludge Treatment |
Saudi Aramco |
Kafji |
||||||
|
2 |
Mech. Works for Qatif Gosp-1 Project |
Aramco/Snampragoti |
Qatif |
||||||
|
3 |
Civil, Mechanical, Electrical & Instrumentation for Sodium Chlorite Incinerator Plant. |
JANA |
Jubail |
||||||
|
4 |
Install SS Pipe Spools |
Jubail Chem. Co. |
Jubail |
||||||
|
5 |
Replace HV Starters @ Tarut Bay |
Saudi Aramco |
Tarut/Qatif |
||||||
|
6 |
Dammam Development Yard Utilities Network |
Star Yard Development |
Dammam |
||||||
|
7 |
Building Trade maintenance |
SHARQ |
Jubail |
||||||
|
8 |
Construction, Maint. & Repair Services |
SHARQ |
Jubail |
||||||
|
9 |
Install Ammonia Dozing Pump |
TASNEE |
Jubail |
||||||
|
10 |
Install Hexane Pump & associated Piping |
TASNEE |
Jubail |
||||||
|
11 |
Foam & Fire water Sprinkler System |
Jubail Chem. Co. |
Jubail |
||||||
|
12 |
Fire Suppression System |
TASNEE |
Jubail |
||||||
|
13 |
Construciton, Maint. & Repair Services |
Saudi Aramco |
RasTanura |
||||||
|
14 |
Turnaround / Shutdown-2006 |
SPC/TASNEE |
Jubail |
||||||
|
15 |
T&I for Rahima North Booster Tank |
Saudi Aramco |
RasTanura |
||||||
|
16 |
Reactor Header & Boiler Repair |
IBN-ZAHR |
Jubail |
||||||
|
17 |
Install Lube Oil Skids with Auto Controls |
Saudi Aramco |
RasTanura |
||||||
|
18 |
Replace 2 x 330 Ton A/C Chillers |
Saudi Aramco |
Tanajeeb |
||||||
|
19 |
Install Structures, Fencing & Grounding |
SCECO |
Jubail |
||||||
|
20 |
Replace 115 KV Power Circuit Breaker |
Saudi Aramco |
Abu Ali |
||||||
|
21 |
Off-Shore Fiber Optic Cable System |
Saudi Aramco |
Abu Ali |
||||||
|
22 |
Install 13.2 KV Switch Gear |
Saudi Aramco |
Dhahran |
||||||
|
23 |
Qatif Water Well Flow Meter Projects |
Saudi Aramco |
Qatif |
||||||
|
24 |
Modify & Install New DC Panel |
SCECO |
Jubail |
||||||
|
25 |
Install Connector Bridges @ HNGL |
Saudi Aramco |
Hawiyah |
||||||
|
26 |
Chlorination System Upgrade @ Riyadh Refinery |
Saudi Aramco |
Riyadh Ref. |
||||||
|
27 |
Install Communication & IT Infrastructure @ Abu Ali |
Saudi Aramco |
Abu Ali |
||||||
|
28 |
Extension of Container Yard @ TASNEE |
TASNEE |
Jubail |
||||||
|
29 |
Steam Condensate System Upgrade @ Riyadh Refinery |
Saudi Aramco |
Riyadh Ref. |
||||||
|
30 |
Fire Fighting System & Structural Works @ Saudi Kayan |
Saudi Kayan / Punj Lloyd |
Jubail |
||||||
|
31 |
Civil Works @ Udhailiyah – ARCC Sub. |
Saudi Aramco / ARCC |
Udhailiyah |
||||||
|
32 |
Replace North South Flank Piping @ Abqaiq |
Saudi Aramco |
Abqaiq |
||||||
|
33 |
Install Emergency Isolation Valve on Discharge Shipper Line & VAC @ Uthmaniyah |
Saudi Aramco |
Uthmaniya |
||||||
|
34 |
Test & Inspection of Raw Water Tank – Al-Khobar |
Saudi Aramco |
Al-Khoabr |
||||||
|
35 |
Replace Corroder Flare Header @ Aindar Gosp2 & 6 |
Saudi Aramco |
Aindar |
||||||
|
36 |
Replace and Upgrade Metal Shop & Valves Shop |
Saudi Aramco |
Uthmaniya |
||||||
|
37 |
Install Corrosion Monitoring System & Automation of GAS Corrosion Inhibitor Pumps @ Aindar&Shedgum |
Saudi Aramco |
Aindar & Shedgum |
||||||
